" Infra Projects Pvt. Ltd." offers fully integrated and complete oil field support services from the wellhead to the midstream and transmission segments of the industry.
This includes an infrastructure of oil and gas production facilities for gathering, treating, separating and processing hydrocarbons. This segment also includes liquids and gas pipelines for transmission of those hydrocarbons to terminal or downstream refineries and facilities for further processing. The pipelines are supported by the stations periodically constructed along the route, necessary for providing compression, pumping, metering and regulating of the hydrocarbons being delivered to downstream destinations. Its clients include major, independent and national oil companies, product and natural gas pipeline transmission companies and oil, gas and product storage companies.

" Infra Projects Pvt. Ltd." participates in the engineering/design, construction and maintenance and life-cycle extension of upstream markets to include:
  • Field oil and gas gathering facilities
  • Transmission pipelines(Oil and Gas)
  • Compressor stations
  • Separation and treating facilities
  • Injection and re-injection facilities
  • Gas storage facilities
  • Crude oil storage facilities
  • Heavy oil processing modules
  • Flow Lines
  • Wellhead and side preparation services
  • Modular Skid for Oil and Gas.

Request for e-Broucher

Name * :

Email ID * :

Contact Number :








NEXT
TOP
  • Pumping stations
  • Metering and regulating stations
  • Loading terminals
  • Intermediate pigging stations
  • Pig launching and receiving stations
NEXT
TOP
CATSKILL undertakes construction of M.S. pipeline network for city gas distribution projects for supplying Piped Natural Gas and Compressed Natural Gas to retail customers including domestic, commercial, industrial and automobiles. The pipeline laying includes the trenching in rocky and normal ground conditions & joint-coating, tie ins, backfilling, cleaning gauging and testing of the sections and assistance for Pre-commissioning and commissioning activities. The pipeline laying includes the tap off points, assistance for the hot tapping works, connections to the existing storage tanks, installation of the isolations valves, installation of the booster's stations and metering stations works and providing assistance for HDD in critical road crossings.